Living room renovation checklist

Mostly a decorating job, unless a chimney, a knock-through or a media wall is involved.

What goes wrong in a living room

  • AvoidOpening up a chimney without a survey and a sweep. An unchecked flue is a safety problem, and a sweep costs an afternoon.
  • AvoidBuilding a media wall before the cable runs are agreed. Retrofitting one HDMI into a finished wall means opening it up again.
  • AvoidRemoving a wall before checking whether it is loadbearing. This is the one item in the house that needs a professional before anything else.
  • AvoidLaying engineered wood straight off the van. It needs to acclimatise in the room first or it will move.

Phase 01

Decide before anyone starts

The layout decisions here are the ones that pull in trades and lead times.

Phase 02

Strip out

Clear the shell and find out what you are actually working with.

Phase 03

Structural and first fix

The buried phase, and the one with the professional sign-offs.

Phase 04

Plaster and dry

Plaster, then wait. The wait is not optional.

Phase 05

Decorate and fit out

Decorate first, floor second, fittings last.

Phase 06

Finish

The snagging pass.

General guidance, not professional or legal advice. The sequencing describes common UK practice. Anything involving gas, electrics, structure or asbestos needs a qualified person, and the rules on permission and sign-off differ by country, so check what applies where you live.