Exterior renovation checklist

Weather-dependent, top-down work where a small unfixed leak quietly undoes everything you did inside.

What goes wrong outside

  • AvoidDecorating inside before the roof and the gutters are sound. Water finds the new plaster first.
  • AvoidPainting an older solid wall with an impermeable coating. It needs to breathe, and sealing it drives damp inwards.
  • AvoidRendering or pointing in a frost. The forecast decides this, not the calendar.
  • AvoidRaising the ground level against the wall so it bridges the damp-proof course. This is a common cause of new damp in an old house.

Phase 01

Survey before you decide anything

Exterior work is the one area where the survey genuinely comes before the wish list.

Phase 02

Make it watertight first

Nothing else outside is worth doing until water is going where it should.

Phase 03

Walls, windows and doors

Top down, and only once the water is under control.

Phase 04

Decorate outside

Weather-dependent, so keep this flexible in the plan.

Phase 05

Ground, boundaries and services

Last, because everything above it drops debris onto it.

General guidance, not professional or legal advice. The sequencing describes common UK practice. Anything involving gas, electrics, structure or asbestos needs a qualified person, and the rules on permission and sign-off differ by country, so check what applies where you live.