39 items
Weather-dependent, top-down work where a small unfixed leak quietly undoes everything you did inside.
Phase 01
Exterior work is the one area where the survey genuinely comes before the wish list.
Phase 02
Nothing else outside is worth doing until water is going where it should.
Phase 03
Top down, and only once the water is under control.
Phase 04
Weather-dependent, so keep this flexible in the plan.
Phase 05
Last, because everything above it drops debris onto it.
General guidance, not professional or legal advice. The sequencing describes common UK practice. Anything involving gas, electrics, structure or asbestos needs a qualified person, and the rules on permission and sign-off differ by country, so check what applies where you live.